From: route@monster.com
Sent: Thursday, April 07, 2016 11:55 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Wendy Schnerr Cell: 570-854-4129 186 Hammond Place Circle North Augusta, SC 29841 E-Mail- heschnerr@yahoo.com Objective: Assignment involving projects where my
initiative, versatility, commitment and creativity are essential. Profile: Twelve years power plant field construction
(predominantly nuclear), six years’ operating plant experience, and four
years home office project controls experience. Expertise in planning &
scheduling, work management, coordination, safety and quality control. Professional Experience: CBI – Plant Vogtle, Waynesboro Ga Senior Scheduler - Aug.2014 – Aug, 2015 Senior scheduler involved in all EPC scheduling
initiatives, development, maintenance and what if scenarios. Resource load
schedules for cost profiles. Support schedule status reporting, variance
analysis, trending and forecasting. Bechtel Power - Temple Tx, Temple Construction Site Senior Construction Lead Planner - Aug 2012 - June
2014 Lead planner responsible for implementation and
maintenance of procurement and construction schedule for site. Work with home engineering and procurement office in
ensuring construction needs are met for site activities. Communicate and
coordinate with superintendents or daily basis. Facilitate daily,
weekly and as need meetings to ensure construction milestones are met.
Maintain/update Levels 1 thru 5 schedules as needed. Perform field walk downs
and identify potential challenges in schedule. Provide and update production
and performance reports, story boards and any other metric required. Bechtel Power - Frederick, Md. Home Office Senior Planner - May 2012 - Aug 2012 Senior Construction Planner responsible for
initiation and maintenance of Construction schedule for combined cycle plant.
Responsible for integration of same schedule into EPC schedule in preparation
of site. Work with estimating and engineering setting up production and performance
curves. PPL Susquehanna Steam Electric Station - Berwick, Pa Outage Management - Nov 2010 - April 2012 Senior Scheduler responsible for generation and
maintenance of refuel outage and forced outage schedules. Work in Outage Control Center during outages as
Senior Scheduler Fluor Corporation - Greenville SC Home Office Senior Project Controls Specialist - Sept 2007 to
Nov. 2010 Responsible for 15 schedulers in the development of
next generating nuclear power plant (South Texas Project), including
engineering, procurement, construction and startup. Point of contact for
multiple company interface for scheduling of project. Identified schedule
risk analysis of South Texas Project using Pertmaster. Bechtel Power - Frederick, Md Home Office Senior Planner - Sept 2006 - Aug 2007 Senior planner involved in scheduling and planning
for new TXU fossil green field and brown field plants in Texas as well as
planning on the Prairie States nuclear project in Illinois O’Connor Construction - Brayton Point Power Plant Scheduler- March 2006 -Aug. 2006 Responsible for tracking in field and implementing
changes to master project schedules. PSEG - Hope Creek/Salem Generating Station Oct. 1996
- Dec. 2003 Work Week Manager/ Work Week Specialist Responsible for
generation and implementation of workweek schedules to execute safe
maintenance of plant equipment. Conduct plan of the day meetings, schedule
review meetings and critique after implementation week. Work Week Coordinator/Work Week Manager PRC Eng.
Inc. - Palo Verde Nuclear Generating Station -July 1994-Sept 1996 Responsible for vendor technical manual information
maintenance project delivering over 1000 vendor document packages to the
client through evaluation and incorporation or maintenance of vendor
documents for a nuclear approved, records management program. Bechtel Construction Co. - Palo Verde Nuclear
Station Jan. 1990 - Jun. 1994 Scheduler/Coordinator/Const Field Engineer Responsible for scheduling/coordination and
verification of design modifications and plant maintenance. Ensure clearances
and permits are in place to support work, ensure project schedules are met.
Conduct turnover meeting to ensure shift-to-shift continuity.
Coordinate/schedule all mobile and stationary crane activities in all three
units. Training coordinator for craft personnel. Knowledgeable in various
safety/OSHA requirements. Ensured compliance to safety procedures and
regulations. BISCO-Comanche Peak Steam Electric Station Jan. 1989
- Nov. 1989 Field Engineer Field engineer responsible for quality control
planning, evaluation, inspection and documentation of various penetration
sealing procedures. Held same responsibilities as those at Limerick site. Bechtel Construction Inc. - Limerick Generating
Station Unit II Aug. 1986 - Jun. 1989 Civil Construction Engineer/Facility Completion Coordinator Responsible for design, coordination and
implementation of all types of penetration seals. Interfaced with other
departments toward the completion of facility turnover from Bechtel to
client. BISCO-Hope Creek Generating Station Sep. 1984 - Aug.
1986 Field Engineer Field engineer responsible for quality control
planning, evaluation, inspection and documentation of penetration seals. Held
same responsibilities as those at the Limerick site. Held supervisor's
position and responsible for added third shift BISCQ-Limerick Generating Station Unit 1 Nov. 1983 -
Sep. 1984 Field Engineer Field engineer in charge of quality control
inspection, evaluation and documentation of various penetration sealing
procedures Trained in inspection and installation of the
sealing, calibration and use of measuring equipment, according to approved
BISCO procedures. United Engineers & Construction, Inc. Seabrook
Station Sep. 1983 - Nov. 1983 Drafter II - Piping and Hangar Department
Responsible for drafting changes to U.E. & C pipe support design
drawings. In charge of pipe support scheduling and tracking sheets. Bechtel Power Corp. Susquehanna Steam Electric
Station Jul. 1981 - Jul.1983 Assistant Construction Engineer Responsible for
incorporation of design document and/or field changes to Bechtel x-series
penetration drawings, masonry wall attachment drawings, isometric electrical
drawings and pipe support drawings. Field walk downs for verification of
type, location and final ''as-build'' of Bechtel Containment, Unit 1 Liner
Plate attachment drawings. Memberships - -WIN (Women in Nuclear) Cambridge
Who’s Who, Toastmasters, AACE Computer: Primavera both P3 and P6, Schedule Risk
analysis Pertmaster, Milestones Professional, SAP, Microsoft Office Products;
O-DOS/DOS, TSO, SIMS, MMIS Education: Luzeme Community College, Nanticoke, PA
(1987-1988) One year registered nursing Columbia-Montour Vocational/Technical School,
Bloomsburg, PA (1979-1981) Certified Drafting and Design Certificates: Root Cause Analysis - Bechtel 2010.
Environment and Hazardous Waste, Bechtel on-site course 1989 ANSI-N-45.2 and NRC 10-CRF50-APP B 1984, 1985
and 1989 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|